Walking into our future clinic this month, we could finally see the new layout taking shape. The walls are up around the front office reception and medical assistant areas, and the space already feels so much more open. It is exciting to see how much has changed in just a few weeks.
Horizon Dermatology and Aesthetics is preparing to open at 9280 W. Sunset Road, Suite 426, in the Southern Hills Medical Office Building in Southwest Las Vegas. Our planned opening remains spring 2027, with medical, surgical, and cosmetic dermatology services.
A new reception area and space for our medical assistant team
Our November 13 photos capture a milestone we have been looking forward to: the new walls defining the reception area and the workspace for our medical assistant team. The rooms are still under construction, but it is much easier to picture the finished clinic now.
There is plenty of work left to do, from closing walls to adding the final finishes. Even at this stage, the difference from our October walkthrough is striking. Seeing these spaces come together makes the opening feel a little closer.
Photos from our November 13 visit and the November 17 contractor visit. Select a photo for a closer look.
What changed in the November 17 construction update?
The latest construction report adds a closer look at the work happening throughout the suite:
Ductwork: rerouting has been completed.
Drywall: patching has been completed.
Painting: work has begun in areas outside the new construction.
Electrical: rough electrical work was scheduled to finish by the end of November 17.
Plumbing: rough plumbing was continuing, with completion expected later in the week.
The report listed construction as on schedule with no unforeseen delays at the time of the update. These are progress milestones, and we will continue sharing updates as the work moves forward.
What comes next?
The next stages include finishing rough plumbing, beginning restroom tile work, continuing painting, and completing the required permit and inspection steps before closing the remaining sides of the new walls. Fire sprinkler and alarm work is also on the construction team’s upcoming schedule.
For us, every visit brings a new detail to get excited about. A finished wall, a freshly painted room, or a clearer view through reception helps turn the plans into a place we cannot wait to welcome you into.
Follow our progress toward spring 2027
Horizon Dermatology and Aesthetics will offer medical dermatology, surgical dermatology, and cosmetic dermatology in Southwest Las Vegas.
Our website, newsletter, and social channels will share opening updates, accepted insurance details, and appointment news as opening approaches. Visit our blog for the latest updates, or follow us on Instagram and TikTok.
Construction update: November 17, 2026. Photos include our November 13 visit and images supplied in the November 17 contractor progress report.